Havering road closures: seven for motorists to avoid this week

Road Closed signs. Tuesday May 12th 2020Road Closed signs. Tuesday May 12th 2020
Road Closed signs. Tuesday May 12th 2020
Havering's motorists will have seven road closures to avoid nearby on the National Highways network this week.

Havering's motorists will have seven road closures to avoid nearby on the National Highways network this week.

And two of them are expected to cause delays of between 10 and 30 minutes.

Hide Ad
Hide Ad

The latest expected works list, with notes from National Highways, shows that seven closures are due to start this week:

A13, from 10pm March 7 to 5am March 8, slight delays (under 10 minutes): M25 clockwise, junction 29, exit slip road and lane closures for electrical works, diversion via, junction 30.

M25, from 10pm March 9 to 5am March 10, slight delays (under 10 minutes): M25 anticlockwise, junction 30, Lane closure for repair of message sign and electrical testing.

A127, from 10pm March 9 to 5.30am March 10, moderate delays (10-30 minutes): M25 clockwise, junction 29, Roundabout East quadrant and lane closure for road marking, diversion via local authority.

Hide Ad
Hide Ad

A13, from 10pm March 13 to 5am March 14, moderate delays (10-30 minutes): A13 southbound, junction A126 to junction MarDyke, Lane, entry and exit slip road closures for carriageway repairs, diversions via local authority network.

A127, from 10pm March 13 to 5am March 15, slight delays (under 10 minutes): M25 clockwise, junction 29, Lane closures for maintenance works.

M25, from 10.30pm March 19 to 5.30am March 20, slight delays (under 10 minutes): M25 clockwise, junction 27 to junction 28, Lane closures for erection works.

M25, from 10.30pm March 19 to 5am March 20, slight delays (under 10 minutes): M25 anti-clockwise, junction 30 to junction 29, Lane closure for erection works.

National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.