Richmond: South London's Orange Tree Theatre to get major redesign so it's more future-proof

Watch more of our videos on ShotsTV.com 
and on Freeview 262 or Freely 565
Visit Shots! now
The major redesign of a popular theatre in South West London is set to begin in 2026 to make it more accessible.

The Orange Tree Theatre, in Richmond, will carry out £4million of works to make the venue much more accessible for disabled people to watch and perform in plays, reduce its environmental impact and secure its future.

The independent theatre said the scheme will put accessibility at the heart of the building, which is currently ‘at best awkward and at worst impossible’ for disabled people to enter. The works are expected to begin in 2026, with the theatre remaining open throughout construction. Allies and Morrison is the architect for the project.

Hide Ad
Hide Ad
Visualisation of The Orange Tree Theatre redevelopmentVisualisation of The Orange Tree Theatre redevelopment
Visualisation of The Orange Tree Theatre redevelopment | Allies And Morrison/LDRS

The venue’s front steps will be removed so that everyone can enter using the same door, while a new lift to all levels will be installed. The foyer will be extended over two levels to double it in size and more toilets will be installed, including an accessible toilet.

Wheelchair spaces in the auditorium will be tripled, while wheelchair users will be able to perform on stage for the first time. The transformed front of house spaces will provide more room for community events, exhibitions, pushchairs and baby-changing facilities.

A new building management system will also be rolled out, along with more energy-efficient lighting, electrical appliances and ventilation. The venue aims to slash carbon dioxide emissions by 22 per cent.

The theatre first opened in a small room above the Orange Tree pub in 1971 opposite the present building on Clarence Street, which it moved into in 1991. It has a theatre in the round, with the audience sitting around the stage and actors performing at the centre.

Hide Ad
Hide Ad
The venue’s front steps will be removed so that everyone can enter using the same doorThe venue’s front steps will be removed so that everyone can enter using the same door
The venue’s front steps will be removed so that everyone can enter using the same door | Google/LDRS

Richmond Council approved the major redevelopment of the venue in March last year. The theatre has already raised more than half of the predicted £4m budget for the project from members and plans to raise another £1m by June next year, before launching a public fundraiser to complete the works.

Hanna Streeter, executive director of Orange Tree Theatre, said: “Our current route in for disabled audiences is at best awkward and at worst impossible. This project will completely transform how we’re able to welcome people into our building with level access, more space for connection and a vibrant street presence.

“Additionally, the new space will enable a growth in revenue opportunities and a reduction in carbon emissions, ensuring we can be a theatre for everyone for generations to come.”

Indiana Lown-Collins, trustee of Orange Tree Theatre, added: “As a disabled artist the industry can feel daunting and like it’s not for you, this project will play its part in changing that and enable more disabled artists, community participants and audiences to have an equitable experience.”

Comment Guidelines

National World encourages reader discussion on our stories. User feedback, insights and back-and-forth exchanges add a rich layer of context to reporting. Please review our Community Guidelines before commenting.

Follow us
©National World Publishing Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice